Qlogic QLogic 12000 Series Guida di Installazione Pagina 34

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 114
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 33
1–Installation
12800-360 Standard Rack Installation
1-24 D000102-000 B
chassis is installed in a 5U or 6U space on top of the support shelf.
NOTE:M6 nut clips should be pre-installed in corresponding locations on
the rack rails before installing the support shelf and the side panels.
8. Assemble cable management hardware on top of the chassis.
Figure 1-20 Top Chassis Cable Management Assembly
9. Attach 2 Top brackets to the top of the chassis. Use screws installed in the
chassis cover. There are 5 screws per bracket.
10. Attach 4 Cable Guide brackets to Top brackets with #10-32 screws. There are
2 screws per Guide bracket.
11. Remove cable trough covers. Attach 2 cable troughs to Top brackets with
#10-32 screws. There are 4 screws per trough. Re-install cable trough covers.
Vedere la pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 113 114

Commenti su questo manuale

Nessun commento